Analysis of Implementation Time Performance Using Earned Value Method

  • Darmawan Pontan Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia
  • Daniel Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia
  • Pentagon Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia
  • Manisha Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia
  • Indrawati Sumeru Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia
Keywords: Earned Value Method, Earned value, Scheduling, Time, Performance

Abstract

Construction projects often face cost and time constraints, while projects are required to be completed on schedule. To overcome these problems, an accurate management system is needed in a construction project to measure time performance, which refers to the progress of the work. By applying the earned value management (EVM) method, it is possible to project progress and weekly performance indices, making it easier to evaluate when there are deviations from the schedule. This study aims to analyze schedule variations and weekly time productivity, enabling the prediction of when the project will be completed. In the construction project of the Faculty of Law Building at Samratulangi University in North Sulawesi Province, reviews were conducted in weeks 1, 5, 10, 11, 20, and 25, where each review period had different CV, SV, and CPI values, allowing to assess at which time the predicted time was closest to the actual time occurring on-site.

References

Abd-Elazeem, A. M., & Farouk, A. (2023). The Efficiency of time management during the design process for residential buildings to achieve sustainable project management. International Journal of Architectural Engineering and Urban Research, 6(2), 320-337.

Adeyemi Bode, T., & Ragab, Z. B. (2024). Adoption of Project Management Strategies and Minimization of Time and Cost in Project Execution. American Journal of Economics and Business Management, 7(3), 23-23.

Adeyemi, A. B., Ohakawa, T. C., Okwandu, A. C., Iwuanyanwu, O., & Ifechukwu, G. O. (2024). Advanced Building Information Modeling (BIM) for affordable housing projects: Enhancing design efficiency and cost management. J. Build. Inf. Model, 12, 45-60.

Aramali, V., Gibson Jr, G. E., El Asmar, M., & Cho, N. (2021). Earned value management system state of practice: Identifying critical subprocesses, challenges, and environment factors of a high-performing EVMS. Journal of Management in Engineering, 37(4), 04021031. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000925

Basiru, J. O., Ejiofor, C. L., Onukwulu, E. C., & Attah, R. U. (2023). The impact of contract negotiations on supplier relationships: A review of key theories and frameworks for organizational efficiency. International Journal of Multidisciplinary Research and Growth Evaluation, 4(1), 788-802.

Bungau, C. C., Bungau, T., Prada, I. F., & Prada, M. F. (2022). Green buildings as a necessity for sustainable environment development: dilemmas and challenges. Sustainability, 14(20), 13121. https://doi.org/10.3390/su142013121

Cruz Rios, F., Grau, D., & Bilec, M. (2021). Barriers and enablers to circular building design in the US: An empirical study. Journal of construction engineering and management, 147(10), 04021117. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002109

Damij, N., & Damij, T. (2021). An approach to optimizing Kanban board workflow and shortening the project management plan. IEEE transactions on engineering management, 71, 13266-13273.

Djirong, A., Jayadi, K., Abduh, A., Mutolib, A., Mustofa, R. F., & Rahmat, A. (2024). Assessment of student awareness and application of eco-friendly curriculum and technologies in Indonesian higher education for supporting sustainable development goals (SDGs): A case study on environmental challenges. Indonesian Journal of Science and Technology, 9(3), 657-678. https://doi.org/10.17509/ijost.v9i3.74385

Dzaiy, A. H. S., & Abdullah, S. A. (2024). The use of active learning strategies to foster effective teaching in higher education institutions. Zanco Journal of Human Sciences, 28(4), 328-351.

Edelweis, G. K., Tulung, G. J., & Sigarlaki, S. J. (2024). The Role of Teacher and Peer Relationships on Improving Students' Motivation in English Department at Sam Ratulangi University. Innovative: Journal Of Social Science Research, 4(1), 2100-2113.

Gurgun, A. P., Koc, K., & Kunkcu, H. (2024). Exploring the adoption of technology against delays in construction projects. Engineering, Construction and Architectural Management, 31(3), 1222-1253. https://doi.org/10.1108/ECAM-06-2022-0566

Jacobs, R. L., & Mohammad, J. (2025). Developing employee expertise through structured on-the-job training (S-OJT): an introduction to this training approach and the KNPC experience. In Andragogy in Practice (pp. 135-155). Routledge.

Joshi, A., Singh, R., Kumar, V., & Rani, S. (2024). Net zero strategy: Exploring opportunities, confronting challenges for developing countries. In Transition Towards a Sustainable Future: Net Zero Policies and Environmental Sustainability (pp. 233-252). Singapore: Springer Nature Singapore. https://doi.org/10.1007/978-981-97-5756-5_11

Joshi, H. (2024). Artificial intelligence in project management: A study of the role of ai-powered chatbots in project stakeholder engagement. Indian Journal of Software Engineering and Project Management (IJSEPM). https://doi.org/10.54105/ijsepm.B9022.04010124

Karmila, T., Romauli, R., Rahmawati, R., & Hakim, A. (2024). The Influence of Organizational Culture on the Performance Efforts of Pusdatin Employees to Support the Main Tasks of Pusdatin Kemhan. Dinasti International Journal of Management Science (DIJMS), 5(3).

Kuinkel, M. S., Zhang, C., Felton, G., Demirkesen, S., & Li, H. (2024). Compromise or problem solve: Conflicts in construction schedule updates. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 16(1), 04523056. https://doi.org/10.1061/JLADAH.LADR-1048

Lodi, E., Perrella, L., Lepri, G. L., Scarpa, M. L., & Patrizi, P. (2021). Use of restorative justice and restorative practices at school: A systematic literature review. International Journal of Environmental Research and Public Health, 19(1), 96. https://doi.org/10.3390/ijerph19010096

Orieno, O. H., Ndubuisi, N. L., Eyo-Udo, N. L., Ilojianya, V. I., & Biu, P. W. (2024). Sustainability in project management: A comprehensive review. World Journal of Advanced Research and Reviews, 21(1), 656-677. https://doi.org/10.1097/MD.0000000000041279

Pamuji, S., Baharuddin, K. M., Novianto, A. Y., Kasmin, K., & Wibowo, E. P. (2024). Time Management: The Key to Success in Managing Complex Projects. Journal Markcount Finance, 2(3), 361-370.

Roehrich, J. K., Kalra, J., Squire, B., & Davies, A. (2023). Network orchestration in a large inter‐organizational project. Journal of Operations Management, 69(7), 1078-1099. https://doi.org/10.1002/joom.1237

Shoar, S., Yiu, T. W., Payan, S., & Parchamijalal, M. (2023). Modeling cost overrun in building construction projects using the interpretive structural modeling approach: a developing country perspective. Engineering, Construction and Architectural Management, 30(2), 365-392. https://doi.org/10.1108/ECAM-08-2021-0732

Shoushtari, F., Daghighi, A., & Ghafourian, E. (2024). Application of artificial intelligence in project management. International journal of industrial engineering and operational research, 6(2), 49-63. https://doi.org/10.22034/ijieor.v6i2.89

Slaeat, F. (2024). The Impact Of Poor Planning On The Duration And Cost Of The Projects: The Implications Of Poor Planning On The Projects. Mesopotamian Journal Of Civil Engineering, 2024, 60-81. https://doi.org/10.58496/MJCE/2024/009

Smyth, E., & Vanclay, F. (2024). Social impacts of land acquisition, resettlement and restrictions on land use. In Handbook of Social Impact Assessment and Management (pp. 355-376). Edward Elgar Publishing. https://doi.org/10.4337/9781802208870.00033

Sobh, A., Darwish, S., Etman, M., & Elfar, A. (2024). Using Earned Value Management and Value Engineering tools to enhance system’s productivity, A proposed Framework. Engineering Research Journal, 183(4), 1-23.

Tuankotta, S., Zacharias, T., & Laurens, S. (2024). Analysis of Project Supervision Performance in the Water Resources Sector of the Public Works and Spatial Planning Service of Central Maluku Regency. Journal of Social Science, 5(4), 1085-1098. https://doi.org/10.46799/jss.v5i4.867

Ugwu, C. N., Ugwu, O. P. C., Alum, E. U., Eze, V. H. U., Basajja, M., Ugwu, J. N., ... & Uti, D. E. (2025). Sustainable development goals (SDGs) and resilient healthcare systems: Addressing medicine and public health challenges in conflict zones. Medicine, 104(7), e41535. https://doi.org/10.1097/MD.0000000000041535

Vizeshfar, F., Rakhshan, M., Shirazi, F., & Dokoohaki, R. (2022). The effect of time management education on critical care nurses’ prioritization: a randomized clinical trial. Acute and critical care, 37(2), 202. https://doi.org/10.4266/acc.2021.01123

Warouw, D. M., Himpong, M. D., & Onsu, R. R. (2023). Motives for Participating in the Social Humanities Research Student Creativity Program at Sam Ratulangi University. Journal La Edusci, 4(6), 488-499. https://doi.org/10.37899/journallaedusci.v4i6.901

Werang, B. R., Margunayasa, I. G., Suarjana, I. M., Wibawa, I. M. C., Rati, N. W., Putu, N., ... & Leba, S. M. R. (2025). The Impact of Parental Support and School Environment on Student Academic Achievement. IRASS Journal of Arts, Humanities, and Social Sciences, 2(6), 143-151.

Yang, J. B., & Lai, T. H. (2024). Selecting EVM, ESM and EDM (t) for managing construction project schedule. Engineering, Construction and Architectural Management, 31(12), 4988-5006. https://doi.org/10.1108/ECAM-02-2023-0115

Zhao, J., Uhde, E., Salthammer, T., Antretter, F., Shaw, D., Carslaw, N., & Schieweck, A. (2024). Long-term prediction of the effects of climate change on indoor climate and air quality. Environmental research, 243, 117804. https://doi.org/10.1016/j.envres.2023.117804

Published
2025-10-06
How to Cite
Pontan, D., Daniel, D., Pentagon, P., Manisha, M., & Sumeru, I. (2025). Analysis of Implementation Time Performance Using Earned Value Method. Journal La Multiapp, 6(5), 1332-1346. https://doi.org/10.37899/journallamultiapp.v6i5.2456