The Influence of Material Control Systems on Remaining Materials in Structural Work

  • Joan Riadi Master of Civil Engineering, University Tama Jagakarsa, Indonesia
  • Moh. Azhar Master of Civil Engineering, University Tama Jagakarsa, Indonesia
  • Pio Ranap Tua Naibaho Master of Civil Engineering, University Tama Jagakarsa, Indonesia
Keywords: Construction Projects, Structural Works, Construction Waste

Abstract

Digital transformation has increased operational efficiency infrastructure critical, but at the same time also open new loophole against attack increasingly complex and destructive cyberspace. This study aims to identify spectrum threat cyber targeting infrastructure critical, analyzing vulnerability accompanying systemic, as well evaluate strategy multi-level protection used in mitigation risk cyber. Using approach qualitative through review methods systematically, this study examines 20 primary sources in the form of scientific journals, policy reports, and studies. case international published 2015–2024. The research results revealed that threats such as ransomware, Advanced Persistent Threats (APT), attacks AI -based, and zero-day exploits are becoming a form of attack dominant, with energy, health, and communications sectors as the main targets. Vulnerabilities systemic found in aspects of old technology that is not updated, governance weaknesse, as well as low awareness cyber at the level operational. Strategy effective protection nature layered, including perimeter security, access management, data encryption, training awareness, to response incidents and system recovery. This study recommends integration strategy adaptive, data -based protection risk, and supported by policies strong national to strengthen resilience cyber sector infrastructure critical.

References

Ahmadzadeh Amid, S., Noorzai, E., & Golabchi, M. (2023). Identifying factors affecting waste production throughout the construction project life cycle and proposing BIM-based solutions. The TQM Journal, 35(6), 1449-1470. http://dx.doi.org/10.1108/TQM-09-2021-0272

Ahmed, B. A. (2024). Optimizing Project Management Methodologies to Enhance Efficiency and Success in New Product Development (Doctoral dissertation, Politecnico di Torino).

Al-Nakeeb, A., El Khatib, M., Zitar, R. A., Alhosani, A., & Alhosani, I. (2023). Project Manager’s role in manage Project knowledge process: An approach to enhance Project quality. International Journal for Computers & Their Applications, 30(4).

Bajjou, M. S., & Chafi, A. (2022). Exploring the critical waste factors affecting construction projects. Engineering, Construction and Architectural Management, 29(6), 2268-2299. https://doi.org/10.1108/ECAM-12-2020-1097

Carrara, S., Bobba, S., Blagoeva, D., ALVES, D., Cavalli, A., Georgitzikis, K., ... & Christou, M. (2023). Supply chain analysis and material demand forecast in strategic technologies and sectors in the EU–A foresight study.

Chaise, E. Q., Lians, K. S., & Alifen, R. S. (2025). Analisa Sisa Material Pada Pekerjaan Struktur Konstruksi Beton Bertulang. Jurnal Dimensi Pratama Teknik Sipil, 9(2), 78–85.

Dewi, R. A., & Sembiring, R. A. (2022). Analisa Perbandingan Penggunaan Bekisting Konvensional Dan Sistem Pada Gedung Bertingkat. Educational Building Jurnal Pendidikan Teknik Bangunan Dan Sipi, 8(1), 9–14.

Hidayat, A., & Suripto, H. (2019). Klasifikasi Pengendalian Material Dalammencegah Keterlambatan Proyek Di Kabupaten Rokan Hulu. Aplikasi Teknologi (APTEK), 11(2), 91–96. https://doi.org/10.30606/aptek.v11i2.73

Iwan, Supardi, S., & Watono. (2025). Analisa Efektivitas Organisasi Balai Pelaksana Pemilihan Jasa Konstruksi (BP2JK) Wilayah Sulawesi Barat. Jurnal Teslink: Teknik Sipil Dan Lingkungan, 1(1), 328–339. https://doi.org/10.52005/teslink.v7i1.574

Kerzner, H. (2002). Strategic planning for project management using a project management maturity model. John Wiley & Sons.

Klojcnik, T., Sagadin, T. A., & Kralj, D. (2018). Project Management: A Systematic Approach to Planning, Scheduling, and Controlling Sustainable Transformation. International Journal of Economics and Management Systems, 3.

Kumendong, J. G., Arsjad, T. T., & Walangitan, D. R. O. (2024). Metode Pelaksanaan Konstruksi Pekerjaan Beton Pada Proyek Pembangunan Rumah Dinas Kejari Kotamobagu. Tekno, 22(87), 125–134. https://doi.org/10.35793/jts.v22i87.53842

Liman, K., & Sulistio, H. (2020). Waste Material Beton Pada Proyek Konstruksi Di Jakarta. JMTS: Jurnal Mitra Teknik Sipil, 3(1), 183–190. http://dx.doi.org/10.24912/jmts.v3i1.7066

Mahendra, A. A. B., & Ridwan, M. (2023). Perencanaan Konstruksi Bangunan Gedung Enam Lantai. Akselerasi: Jurnal Ilmiah Teknik Sipil, 5(1), 66–73.

Maryanti, D. F. (2017). Performance of community-based solid waste management for integrated and sustainable solid waste management: The case of Bogor City, Indonesia (Doctoral dissertation, Unesco-Ihe).

Maukar, A. L., Kesuma, D. A., & Widodo, A. A. (2023). Application of Waterfall-System Development Life Cycle Methodology for Designing Purchase Order Material Control System. Nform: Jurnal Ilmiah Bidang Teknologi Informasi Dan Komunikasi, 8(2), 102–110. http://dx.doi.org/10.25139/inform.v8i2.5138

Melly, S., Mulyati, I., Ely, H., Setyawati, D., Hidayanto, & Yunus, A. I. (2024). Manajemen proyek (1st ed., Issue 1). CV Hei Publishing Indonesia, Padang.

Mokosuli, T. A. P. J., Mangare, J. B., & Tjakra, J. (2023). Evaluasi Sisa Material Konstruksi Menggunakan Metode Pareto Dan Fishbone Diagram Pada Proyek Pembangunan Rumah Tipe 72/125 Di Perumahan Sawangan Permai. Tekno, 21(85), 849–856. https://doi.org/10.35793/jts.v21i85.49308

Nasikhin, M. K., & Triarso, A. (2023). Metode Pelaksanaan Pekerjaan Struktur Kolom Pada Proyek Pembangunan Passengger Terminal Building Bandara Internasional Dhoho Kediri. Jurnal Vokasi Teknik Sipil, 1(3), 117–123.

Nawawi, M., Muttaqin, & Afifuddin, M. (2021). Faktor-Faktor Penyebab Timbulnya Waste Materials Dalam Pelaksanaan Proyek Konstruksi Gedung Di Kota Banda Aceh. Teras Jurnal, 11(2), 295–306. https://doi.org/10.29103/tj.v11i2.479

Parsamehr, M., Perera, U. S., Dodanwala, T. C., Perera, P., & Ruparathna, R. (2023). A review of construction management challenges and BIM-based solutions: perspectives from the schedule, cost, quality, and safety management. Asian Journal of Civil Engineering, 24(1), 353-389. https://doi.org/10.1007/s42107-022-00501-4

Peng, X., Jiang, Y., Chen, Z., Osman, A. I., Farghali, M., Rooney, D. W., & Yap, P. S. (2023). Recycling municipal, agricultural and industrial waste into energy, fertilizers, food and construction materials, and economic feasibility: a review. Environmental Chemistry Letters, 21(2), 765-801. http://dx.doi.org/10.1007/s10311-022-01551-5

Pertiwi, I. M., Herlambang, F. S., & Kristinayanti, W. S. (2019). Analisis Waste Material Konstruksi Pada Proyek Gedung (Studi Kasus Pada Proyek Gedung Di Kabupaten Badung). Jurnal Simetrik, 9(1), 185–190. https://doi.org/10.31959/js.v9i1.204

Pham Van, B., & Peansupap, V. (2024). Confirmatory analysis on factors influencing the material management effectiveness in construction projects. Engineering, Construction and Architectural Management, 31(6), 2536-2562. http://dx.doi.org/10.1108/ECAM-09-2021-0811

Porzio, J., & Scown, C. D. (2021). Life‐cycle assessment considerations for batteries and battery materials. Advanced Energy Materials, 11(33), 2100771. https://doi.org/10.1002/aenm.202100771

Purchase, C. K., Al Zulayq, D. M., O’Brien, B. T., Kowalewski, M. J., Berenjian, A., Tarighaleslami, A. H., & Seifan, M. (2021). Circular economy of construction and demolition waste: A literature review on lessons, challenges, and benefits. Materials, 15(1), 76. https://doi.org/10.3390/ma15010076

Purchase, C. K., Al Zulayq, D. M., O’Brien, B. T., Kowalewski, M. J., Berenjian, A., Tarighaleslami, A. H., & Seifan, M. (2021). Circular economy of construction and demolition waste: A literature review on lessons, challenges, and benefits. Materials, 15(1), 76. https://doi.org/10.3390/ma15010076

Putra, M. R. F. B. P., Safitri, F. A., & Rifqi, M. G. (2024). Perbandingan Waktu Pekerjaan Bekisting Konvensional Dengan Bekisting Sistem Pada Pekerjaan Kolom Proyek Pembangunan Gedung Rumah Sakit Gresik Sehati. J-RITEKS: Jurnal Riset Teknik Sipil Dan Sains, 3(1), 29–35. https://doi.org/10.57203/j-riteks.v3i1.2024.29-35

Putri, L. D., Soehardi, F., & Dinata, M. (2021). Identifikasi Material Sisa dan Penanganan Pada Pekerjaan Kontruksi Jalan. Sainstek, 9(2), 1–15.

Sandberg, D., Gorbacheva, G., Lichtenegger, H., Niemz, P., & Teischinger, A. (2023). Advanced engineered wood-material concepts. In Springer Handbook of Wood Science and Technology (pp. 1835-1888). Cham: Springer International Publishing. http://dx.doi.org/10.1007/978-3-030-81315-4_35

Semita, A., & Sucita, I. K. (2024). Pelaksanaan Pekerjaan Pembesian Pada Struktur Bangunan Gedung Kantor Lantai 2 Pada Proyek Smk- Sekolah Menengah Analisis Kimia Bogor (SMK- SMAKBO). Seminar Nasional Teknik Sipil Politeknik Negeri Jakarta, 1(1), 192–209.

Setiyawan, Z. N. K., Hussein, M. A. Al, Utama, A. B., & Fernando, R. (2023). Perbandingan Metode Bekisting Kolom Sistem Semi Dan Sistem Mesa Pada Proyek Gedung Di Kota Semarang. Jurnal Inovasi Konstruksi, 2(1), 20–30. http://dx.doi.org/10.56911/jik.v2i1.33

Stark, N., & Cai, Z. (2021). Wood-based composite materials: panel products, glued laminated timber, structural composite lumber, and wood–nonwood composites. Chapter 11 in FPL-GTR-282, 11-1.

Stroupe, D., & Carlone, H. B. (2022). Leaving the laboratory: Using field science to disrupt and expand historically enduring narratives of science teaching and learning. Science & Education, 31(4), 893-921. https://doi.org/10.1007/s11191-021-00296-x

Sugiyono. (2022). Metodologi Penelitian Kuantitatif, Kualitatif dan R & D. Alfabeta.

Wamaungo, A. J., & Kamil, M. (2024). Community Education and its Role in Promoting Smart Cities within a Rapidly Changing Technological Environment. JENTRE, 5(1), 1-16. https://doi.org/10.38075/jen.v5i1.481

Published
2025-09-16
How to Cite
Riadi, J., Azhar, M., & Naibaho, P. R. T. (2025). The Influence of Material Control Systems on Remaining Materials in Structural Work . Journal La Multiapp, 6(5), 1171-1182. https://doi.org/10.37899/journallamultiapp.v6i5.2369