Analysis of Waste in the Production System with the Approach Lean Manufacturing Method

  • Prastyo Utomo Departmen of Industrial Engineering, Universitas Pembangunan Nasional “Veteran” Jawa Timur
  • Endang Pudji Departmen of Industrial Engineering, Universitas Pembangunan Nasional “Veteran” Jawa Timur
Keywords: Lean Manufacture, Visual Stream Mapping, FMEA, PAM, Seven Waste

Abstract

Improving the production process needs to be done continuously and continuously in order to minimize all activities that consume time but do not contribute directly to the value of the products produced. PT Cipta Oggi is a manufacturing company that makes furniture products which has a major problem, namely the low value of Process Cycle Efficiency, which the company should have a PCE value of at least 50%.  The use of lean manufacturing methods with the help of VSM is used to reduce waste in order to increase the PCE value. There are 22 non-added value activities with a time range of 427 minutes that can be cut. Where the production time was originally 1353 minutes to 926 minutes which had an impact on increasing Process Cycle Efficiency which was originally 46.8% to 68.4%. Based on Failure Mode and Effect Analysis (FMEA), it is known that the main root cause that has the highest RPN value is the Overprocessing waste with a score of 420 and the proposed improvements in order to reduce this waste are the need for safe storage management that can reduce the risk of damage to goods which requires additional processes, namely rework and additional human resources are needed in the inspection process in order to reduce the number of rework.

References

Arif, R., & Gunawan, A. G. (2023). Diagram Pareto dan Diagram Fishbone: Penyebab yang mempengaruhi Keterlambatan Pengadaan Barang di Perusahaan Industri Petrochemicals Cilegon Periode 2020-2022. Jurnal Riset Bisnis dan Manajemen Tirtayasa, 7(1), 1-10.

Balamurugan, A., & Sudhakarapandian, R. (2024). Investigation of Non-Value-Added Activities to Mitigate Impacting Parameter on Lead Time in The Mass-Customized Glass Process Industry. International Journal of Industrial Engineering: Theory, Applications and Practice, 31(5). https://doi.org/10.23055/ijietap.2024.31.5.9997

Baldah, N., Amaruddin, H., & Sutaryo, S. (2021). Pendekatan Value Stream Mapping Pada Optimalisasi Proses Dan Peningkatan Produktivitas. Maker: Jurnal Manajemen, 7(2), 136-144. https://doi.org/10.37403/mjm.v7i2.342

Boediono, N. G. B., & Sutapa, I. N. (2020). Eliminasi Non-Value Added Activity dengan Merancang Ulang Standard Operating Procedure: Studi Kasus di Sebuah Perusahaan Produksi Obat Nyamuk Bakar. Jurnal Titra, 8(2).

Erdhianto, Y. (2021). Quality Control Analysis to reduce the number of defects in the packaging of PG Kremboong Sugar Products using seven tools method. Tibuana Journal of Applied Industrial Engineering, 4(1), 1. http://dx.doi.org/10.36456/tibuana.4.01.3174.28-35

Fatma, N. F., Ponda, H., & Sutisna, E. (2022). Penerapan lean manufacturing dengan metode Value Stream Mapping untuk mengurangi waste pada proses pengecekan material bahan baku ke lini produksi. Journal Industrial Manufacturing, 7(1), 41-54. https://doi.org/10.31000/jim.v7i1.5969

Fitriani, E., & Rochmoeljati, R. (2023). Waste Analysis of Sugar Production Process Using Lean Six Sigma Method. IJIEM - Indonesian Journal of Industrial Engineering and Management, 4(3), 406. https://doi.org/10.22441/ijiem.v4i3.21226

Fontana, A., & Gaspers, V. (2011). Lean Six Sigma For Manufacturing and Service Industries. Bogor: Vinchristo Publication.

García-Alcaraz, J. L., Díaz Reza, J. R., Sánchez Ramírez, C., Limon Romero, J., Jimenez Macias, E., Lardies, C. J., & Rodríguez Medina, M. A. (2021). Lean manufacturing tools applied to material flow and their impact on economic sustainability. Sustainability, 13(19), 10599. https://doi.org/10.3390/su131910599

Haekal, J. (2022). Integration of Lean Manufacturing and Promodel Simulation on Repair Production Process Flow of Polysilane Bottle Printing Using VSM, WAM, VALSAT, And RCA Methods: Case Study Packaging Manufacturing Company. International Journal of Scientific Advances (IJSCIA), 3(2), 235-243. https://doi.org/10.51542/ijscia.v3i2.15

Hidayati, J., & Shalihin, A. (2020). Reducing waste order production process more efficient approach effective and lean manufacturing (Journal Review). In IOP Conference Series: Materials Science and Engineering (Vol. 725, No. 1, p. 012001). IOP Publishing. http://dx.doi.org/10.1088/1757-899X/725/1/012001

Hines, P., & Rich, N. (1997). The seven value stream mapping tools. International journal of operations & production management, 17(1), 46-64. http://dx.doi.org/10.1108/01443579710157989

Ismail, N. E., Sutomo, A. N., & Muchtaridi, M. (2023). Analisis Minimalisasi Waste pada Waktu Produksi untuk Meningkatkan Efektivitas Produksi. Indonesian Journal of Pharmaceutical Science and Technology, 10(1), 31–36.

Javaid, M., Haleem, A., Singh, R. P., Rab, S., Suman, R., & Khan, S. (2022). Exploring relationships between Lean 4.0 and manufacturing industry. Industrial Robot: the international journal of robotics research and application, 49(3), 402-414. http://dx.doi.org/10.1108/IR-08-2021-0184]

Khunaifi, A., Rangga Primadasa, & Sugoro Bhakti Sutono. (2022). Implementasi Lean Manufacturing untuk Meminimasi Pemborosan (Waste) Menggunakan Metode Value Stream Mapping di PT. Pura Barutama. Jurnal Rekayasa Industri (JRI), 4(2), 87–93. https://doi.org/10.37631/jri.v4i2.560

Kumar, N., Hasan, S. S., Srivastava, K., Akhtar, R., Yadav, R. K., & Choubey, V. K. (2022). Lean manufacturing techniques and its implementation: A review. Materials Today: Proceedings, 64, 1188-1192. http://dx.doi.org/10.1016/j.matpr.2022.03.481

Larasati, P. D., & Laksono, P. W. (2022). Implementasi Lean Manufacturing untuk Mempersingkat Lead Time di PT XYZ dengan Metode Value Stream Mapping. Seminar dan Konferensi Nasional IDEC 2022, 1–8.

Lu, S., & Aidil, J. (2024). Implementation of Lean Manufacturing Approach Using Value Stream Mapping to Optimize Cycle Time and Reduce Process Waste ( Case Study : CV.Teguh Jaya Mandiri). IJIEM - Indonesian Journal of Industrial Engineering & Management 5(2), 589–599. https://doi.org/10.22441/ijiem.v5i2.22440

Małysa, T., Furman, J., Pawlak, S., & Šolc, M. (2024). Application of Selected Lean Manufacturing Tools to Improve Work Safety in the Construction Industry. Applied Sciences (2076-3417), 14(14). https://doi.org/10.3390/app14146312

Nelfiyanti, Saputra, D., & Puteri, R. A. M. (2023). Penerapan Value Stream Mapping Tools dalam Meminimasi Pemborasan Proses Packing Part Disc di line Servis. JISI: Jurnal Integrasi Sistem Industri, 10(1), 9. https://doi.org/10.24853/jisi.10.1.9-18

Niekurzak, M., Lewicki, W., Coban, H. H., & Bera, M. (2023). A model to reduce machine changeover time and improve production efficiency in an automotive manufacturing organisation. Sustainability, 15(13), 10558. https://doi.org/10.3390/su151310558

Novitasari, B. D., & Rochmoeljati, R. (2021). Implementasi Value Stream Mapping dan Value Stream Analysis Untuk Meminimalisir Pemborosan Waktu Pendistribusian di PT. Nur Jaya Energi. Juminten, 2(6), 132–143. https://doi.org/10.33005/juminten.v2i6.336

Nurwulan, N. R., Taghsya, A. A., Astuti, E. D., Fitri, R. A., & Nisa, S. R. K. (2021). Pengurangan Lead Time dengan Lean Manufacturing: Kajian Literatur. Journal of Industrial and Manufacture Engineering, 5(1), 30–40. https://doi.org/10.31289/jime.v5i1.3851

Odi, A., Zaman, A. N., Nasution, S. R., & Sundana, S. (2019). Analisis Pengurangan Waste Pada Proses Perawatan Kereta. Jurnal Asiimetrik: Jurnal Ilmiah Rekayasa & Inovasi, 34-42. https://doi.org/10.35814/asiimetrik.v1i1.220

Oktavia, A. (2021). Analisis Pengendalian Kualitas Produk Menggunakan Pendekatan Statistical Quality Control (SQC) di PT. Samcon. Industri Inovatif: Jurnal Teknik Industri, 11(2), 106-113. https://doi.org/10.36040/industri.v11i2.3666

Pamungkas, I., & Irawan, H. T. (2020). Strategi Pengurangan Risiko Kerusakan Pada Komponen Kritis Boiler di Industri Pembangkit Listrik. Jurnal Optimalisasi, 6(1), 86–95. https://doi.org/10.35308/jopt.v6i1.2197

Parwani, V., & Hu, G. (2021). Improving manufacturing supply chain by integrating SMED and production scheduling. Logistics, 5(1), 4. https://doi.org/10.3390/logistics5010004

Pattiapon, M. L., Maitimu, N. E., & Magdalena, I. (2020). Penerapan Lean Manufacturing Guna Meminimasi Waste Pada Lantai Produksi (Studi Kasus: Ud. Filkin). Arika, 14(1), 23–36. https://doi.org/10.30598/arika.2020.14.1.23

Pratiwi, A. L., & Widjajati, E. P. (2023). Analisis Pemborosan Pada Proses Aliran Pergudangan PT. FLSmidth Indonesia dengan Metode Lean Warehousing. Jurnal Teknik Mesin, Industri, Elektro Dan Informatika (JTMEI), 2(4), 124–135. https://doi.org/10.55606/jtmei.v2i4.2993

Putra, M. R. I., & Rochmoeljati, R. (2024). Analysis of Waste in the Warehousing Process of PT . Asia Plastik sing Lean Warehousing and Improvement Strategy with Kaizen Method. IJIEM - Indonesian Journal of Industrial Engineering and Management 5(2), 437–450. https://doi.org/10.22441/ijiem.v5i2.22741

Reda, H., & Dvivedi, A. (2022). Application of value stream mapping (VSM) in low-level technology organizations: a case study. International Journal of Productivity and Performance Management, 71(6), 2393-2409. http://dx.doi.org/10.1108/IJPPM-03-2021-0118

Salmaa, A. S., & Isnaini, E. N. (2022). Get To Know Production Activities : “Definition, Purpose, Factors, Functions, And Type Of Production". Jurnal Ekonomi, Manajemen dan Akuntansi, 1(1), 1–6. https://jurnal.pptq-annaafi.org/index.php/jemantansi%0Ahttps://jurnal.pptq

Salunkhe, R. T., & Shinge, A. R. (2018). Value Stream Mapping to Reduce Lead Time and Improve Throughput Time in a Manufacturing Organization: A Review. IUP Journal of Operations Management, 17(3), 42-52.

Sangwa, N. R., & Sangwan, K. S. (2023). Leanness assessment of a complex assembly line using integrated value stream mapping: a case study. The TQM Journal, 35(4), 893-923. https://doi.org/10.1108/TQM-12-2021-0369

Shou, W., Wang, J., Wu, P., & Wang, X. (2020). Value adding and non-value adding activities in turnaround maintenance process: classification, validation, and benefits. Production Planning & Control, 31(1), 60-77. http://dx.doi.org/10.1080/09537287.2019.1629038

Singh, J., Singh, R., Singh, S., Vasudev, H., & Kumar, S. (2023). Reducing scrap due to missed operations and machining defects in 90PS pistons. International Journal on Interactive Design and Manufacturing (IJIDeM), 17(5), 2527-2539. http://dx.doi.org/10.1007/s12008-022-01071-0

Sultan, F. A., Routroy, S., & Thakur, M. (2021). A simulation-based performance investigation of downstream operations in the Indian Surimi Supply Chain using environmental value stream mapping. Journal of Cleaner Production, 286, 125389. http://dx.doi.org/10.1016/j.jclepro.2020.125389

Sumasto, F., Akbar, M. R., Husna, S. F. H., Pratama, I. R., Wulansari, I., Rozi, M. F., & Ismono, A. (2023). Peningkatan Value Added dalam Industri Tahu melalui Penerapan Lean Manufacturing dan Analisis Waste. Jurnal Serambi Engineering, 8(4). https://doi.org/10.32672/jse.v8i4.6876

Vlachos, I. P., Pascazzi, R. M., Zobolas, G., Repoussis, P., & Giannakis, M. (2023). Lean manufacturing systems in the area of Industry 4.0: A lean automation plan of AGVs/IoT integration. Production planning & control, 34(4), 345-358. http://dx.doi.org/10.1080/09537287.2021.1917720

Zulfikar, A. M., & Rachman, T. (2020). Penerapan Value Stream Mapping Dan Process Activity Mapping Untuk Identifikasi Dan Minimasi 7 Waste Pada Proses Produksi Sepatu X Di Pt . Pai. Jurnal Inovisi, 16(1), 13–24

Published
2025-03-24
How to Cite
Utomo, P., & Pudji, E. (2025). Analysis of Waste in the Production System with the Approach Lean Manufacturing Method. Journal La Multiapp, 6(2), 276-295. https://doi.org/10.37899/journallamultiapp.v6i2.1999