Implementation Lean Warehousing Using Waste Assessment Model (WAM) Method
Abstract
Warehouses play an important role in maintaining product quality until the product is delivered to consumers. The many important activities in the warehouse require companies to improve their performance to be effective and efficient in order to maintain trust. ABC Company is a private company engaged in civil construction, landfilling, cut and fill, heavy equipment rental, and spare part distributor. In warehousing activities, there are various activities that don’t have value added or waste. This study aims for identify waste and provide recommendations for improving warehousing activities. The implementation of Lean Warehousing is carried to identifying the warehousing flow process with Value Stream Mapping (VSM), then identifying 7 wastes that occur in the warehousing process using the Waste Assessment Model (WAM) method. The results of the study showed that the waste with the highest percentage level was waste inventory (I) waste overpurchase (O) waste defect (D). From the proposed improvements and Future stream mapping, it was found that the lead time was reduced to 544 minutes, which eliminated 200 minutes of non- value added activity. So that activity increased by 27% from the initial condition.
References
Abbasi, O., Noorzai, E., Gharouni Jafari, K., & Golabchi, M. (2020). Exploring the causes of delays in construction industry using a cause-and-effect diagram: case study for Iran. Journal of architectural engineering, 26(3), 05020008. http://dx.doi.org/10.1061/(ASCE)AE.1943-5568.0000431
Adeodu, A., Maladzhi, R., Katumba, M. G. K. K., & Daniyan, I. (2023). Development of an improvement framework for warehouse processes using lean six sigma (DMAIC) approach. A case of third party logistics (3PL) services. Heliyon, 9(4). https://doi.org/10.1016/j.heliyon.2023.e14915
Ahmad, R., Amin, R. F. M., & Mustafa, S. A. (2022). Value stream mapping with lean thinking model for effective non-value added identification, evaluation and solution processes. Operations Management Research, 15(3), 1490-1509. http://dx.doi.org/10.1007/s12063-022-00265-9
Al-Baik, O., & Miller, J. (2014). Waste identification and elimination in information technology organizations. Empirical Software Engineering, 19, 2019-2061. http://dx.doi.org/10.1007/s10664-014-9302-3
Armyanto, H. D., Djumhariyanto, D., & Mulyadi, S. (2020). Penerapan Lean Manufacturing dengan Metode VSM dan FMEA untuk Mereduksi Pemborosan Produksi Sarden. 13(1), 37–42. https://doi.org/10.24843/JEM.2020.v13.i01.p07
Barabadi, A., & Nouri, A. (2023). From Waste to Value: A Practical Framework for Waste Identification and Mitigation Using Lean Management Principles.
Basiru, J. O., Ejiofor, L. C., Onukwulu, C. E., & Attah, R. U. (2023). Adopting lean management principles in procurement: A conceptual model for improving cost-efficiency and process flow. Iconic Research and Engineering Journals, 6(12), 1503-1522. http://dx.doi.org/10.54660/.IJMRGE.2023.4.1-852-860
Dhika, D., Witonohadi, A.,& Akbari, A,. (2023). The Proposed Warehouse Improvement Using Lean Approach to Eliminate Waste at The Main Warehouse of PT.XYZ. Jurnal Optimasi Sistem Industri, 16(1), 94-109. https://doi.org/10.31315/opsi.v16i1.7310.
Fhadillah, I., Anggraeni, N., F., & Awaliah Sugiarto, A. R. (2020). Analisis Pemborosan di Pt. Xyz Menggunakan 8 Waste. Jurnal Ilmiah Teknologi Informasi Terapan. 6(2), 157-162. https://doi.org/10.33197/jitter.vol6iss2.2020.335
George, M. O. (2010). The lean six sigma guide to doing more with less: cut costs, reduce waste, and lower your overhead. John Wiley & Sons.
Gómez‐Delgado, M., & Tarantola, S. (2006). GLOBAL sensitivity analysis, GIS and multi‐criteria evaluation for a sustainable planning of a hazardous waste disposal site in Spain. International Journal of Geographical Information Science, 20(4), 449-466. https://doi.org/10.1080/13658810600607709
Gwynne, R. (2014). Warehouse management: a complete guide to improving efficiency and minimizing costs in the modern warehouse. Kogan Page Limited.
Kulkarni, P. P., Kshire, S. S., & Chandratre, K. V. (2014). Productivity improvement through lean deployment & work study methods. International Journal of Research in Engineering and Technology, 3(2), 429-434. http://dx.doi.org/10.15623/ijret.2014.0302076
Mahmood, K., & Shevtshenko, E. (2015). Productivity improvement by implementing lean production approach. In Closing Conference of the Project “Doctoral School of Energy and Geotechnology II”, Tallinn University of Technology Ehitajate tee (Vol. 5, No. 19086, pp. 183-188).
Marques, J. P., Sá, J. C., Silva, F. J. G., Pereira, T., Ferreira, L. P., & Santos, G. (2021, October). Safety efficiency value stream mapping (SEVSM)-A new tool to support the implementation of Lean Safety. In IOP Conference Series: Materials Science and Engineering (Vol. 1193, No. 1, p. 012124). IOP Publishing. http://dx.doi.org/10.1088/1757-899X/1193/1/012124
Masuti, P. M., & Dabade, U. A. (2019). Lean manufacturing implementation using value stream mapping at excavator manufacturing company. Materials Today: Proceedings, Vol. 01 No. 19, pp. 606–610. https://doi.org/10.1016/j.matpr.2019.07.740
Mwizerwa, G., & Akumuntu, J. (2024). Effect of Warehousing Management on Supply Chain Performance: A Case of Inyange Industries Ltd. African Journal of Empirical Research, 5(2), 358-370. http://dx.doi.org/10.51867/ajernet.5.2.31
Naziihah, A., Arifin, J.,& Nugraha, B. (2022). Identifikasi Waste Menggunakan Waste Assessment Model (WAM) di Warehouse Raw Material PT.XYZ. Jurnal Media Teknik dan Sistem Industri. 6(1), 30-40. https://doi.org/10.35194/jtmsi.v6i1.1599
Nguyen, D. D., Jeon, B. H., Jeung, J. H., Rene, E. R., Banu, J. R., Ravindran, B., ... & Chang, S. W. (2019). Thermophilic anaerobic digestion of model organic wastes: Evaluation of biomethane production and multiple kinetic models analysis. Bioresource technology, 280, 269-276. http://dx.doi.org/10.21203/rs.3.rs-4546564/v1
Pogowonto, A., & Amrina, U. (2020). Reduction of Cycle Time in Vehicle Engine Assembly LineUsing Karakuri Kaizen. International Journal of Engineering Research and Advanced Technology, 06(10), 49–57. https://doi.org/10.31695/ijerat.2020.3657
Prasetyo, R. A., Herwanto, D., & Nugraha, A. E. (2021). Usulan Penerapan Metode Shared Storage pada Tata Letak Stock di Gudang PT XYZ. Go-Integratif Jurnal Teknik Sistem Dan Industri, 2(2), 124–134. https://doi.org/10.35261/gijtsi.v2i2.5652
Ramadhanti, C., Pramestiana, I.,& Nurulita, S,. (2023). Analisis Penerapan Lean Warehouse untuk Meminimalisir Waste Menggunakan Value Stream Mapping dan Fishbone Diagram. Jurnal Ilmiah Teknologi Informasi Terapan. 9(2), 190-196. https://doi.org/10.33197/jitter.vol9.iss2.2023.1003
Rasanjali, W. A., Mendis, A. P. K. D., Perera, B. A. K. S., & Disaratna, V. (2024). Implementing enterprise resource planning for lean waste minimisation: challenges and proposed strategies. Smart and Sustainable Built Environment, 13(2), 330-353. http://dx.doi.org/10.1108/SASBE-04-2022-0068
Rawabdeh, I. A. (2005). A model for the assessment of waste in job shop environments. International Journal of Operations & Production Management, 25(8), 800-822. https://doi.org/10.1108/01443570510608619
Richards, G. (2017). Warehouse management: a complete guide to improving efficiency and minimizing costs in the modern warehouse. Kogan Page Publishers.
Shou, W., Wang, J., Wu, P., & Wang, X. (2020). Value adding and non-value adding activities in turnaround maintenance process: classification, validation, and benefits. Production Planning & Control, 31(1), 60-77. http://dx.doi.org/10.1080/09537287.2019.1629038
Thürer, M., Tomašević, I., & Stevenson, M. (2017). On the meaning of ‘waste’: review and definition. Production Planning & Control, 28(3), 244-255. http://dx.doi.org/10.1080/09537287.2016.1264640
Thürer, M., Tomašević, I., & Stevenson, M. (2017). On the meaning of ‘waste’: review and definition. Production Planning & Control, 28(3), 244-255. http://dx.doi.org/10.1080/09537287.2016.1264640
Van der Lei, T. E., Enserink, B., Thissen, W. A., & Bekebrede, G. (2011). How to use a systems diagram to analyse and structure complex problems for policy issue papers. Journal of the Operational Research Society, 62(7), 1391-1402. http://dx.doi.org/10.1057/jors.2010.28
Copyright (c) 2025 Journal La Multiapp

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.



