Optimization of Production Capacity Jumbo Bag by Method Theory of Constraints
Abstract
PT. XYZ is a company engaged in production jumbo bag with a capacity of 500–2000 kg. Increased demand occurred in jumbo bag with a capacity of 500 kg which causes problems in the production process, especially at work stations Cutting (SK-4), which experienced obstacles in the form of bottleneck due to limited resource capacity. This condition hampers efficiency and productivity, so that companies are unable to meet production targets during the period May to October 2024. This research aims to optimize production capacity jumbo bag by applying Theory of Constraints (TOC) through approach Drum-Buffer-Rope And Linear Programming which is processed using software POM-QM. Research stages include identification constraint, exploitation constraint, non-subordinatin constraint, as well as elevation constraint. From the results of this research, a solution was obtained in the form of addition shift work at the station Cutting (SK-4) through reduction shift at the station Needle Loom (SK-3) without reducing the number of operators, managed to increase the efficiency of the production process significantly. The implementation results show an increase in production time capacity from 129511 minutes to 291399.8 minutes (an increase of 26%) as well as an increase output production of 1,476 unit to 3,320 unit. Thus, the company managed to overcome obstacles bottleneck, increase operational productivity, and achieve predetermined production targets more optimally.
References
Abdilah, & Nurbani, S. N. (2022). Perencanaan Kapasitas Produksi Untuk Memenuhi Permintaan Konsumen Menggunakan Metode Rough Cut Capacity Planning (RCCP) (Konveksi dan Sablon Garasi Hijrah Apparel). G-Tech : Jurnal Teknologi Terapan, 6(2), 221–230. https://doi.org/10.33379/gtech.v6i2.1678
Adhiputra, R. F. (2021). Optimalisasi Kapasitas Produksi Produk PDS Fender pada PT Arkha Jayanti Persada dengan Theory of Constraints Menggunakan Lindo dan PomQm. Journal Industrial Servicess, 7(1), 83–92. https://doi.org/10.36055/jiss.v7i1.12049
Ahadi, A. A. (2022). Penjadwalan Produksi Dengan Menggunakan Theory Of Constraint Pada Lini Produksi Tiang Pancang Bulat Di PT Wijaya Karya Beton Tbk. Scientifict Journal of Industrial Engineering, 3(2), 5–8. https://doi.org/10.30998/.v3i2.302
Ayustina, B., Nurdini, A., & Lazuardy, A. (2023). Perencanaan Jadwal Induk Produksi pada Produk Tempe di Rumah Tempe Indonesia. Jurnal Ilmiah Teknik, 2(1), 60–75. https://doi.org/10.56127/juit.v2i1.497
Bidiawati, A., & Setiawati, L. (2020). Kajian Drum-Buffer-Robe Berbasis Theory of Constraint Untuk Menyeimbangkan Aliran Produksi. Inaque : Journal of Industrial and Quality Engineering, 8(1), 59–68. https://doi.org/10.34010/iqe.v8i1.2764
Ervil, R., & Yulanda, Z. N. (2020). Identifikasi Kendala Pada Proses Produksi Dengan Menggunakan Theory of Constrain (TOC) Dalam Mengoptimlakan Kapasitas Produksi PDAM Gunung Pangilun. Jurnal Sains Dan Teknologi, 20(2), 162–167. https://doi.org/10.36275/stsp.v20i2.295
Frahdiansari, A. P., Anang, C., & Al Khoirina, A. S. (2024). Efisiensi Sumber Daya Manusia Dalam Pengelolaan Zakat dan Infaq: Pendekatan Dengan Metode Work Load Analisys (WLA) Dan Work Force Analysis (WFA). Jurnal Sains Dan Teknologi, 6(1), 9–18. https://doi.org/10.55338/saintek.v6i1.3125
Hasanah, H., Fatimah, A., & Kurnia, E. (2020). Pendekatan Theory of Constraints Untuk Peningkatan Laba. Jurnal Akutansi Indonesia, 16(1), 1–13.
Ikhwana, A., Taptajani, D. S., & Nurul Hikmah, I. W. (2024). Perencanaan Kapasitas Produksi Industri Pakan Ternak dengan Metode Theory of Constraints. Jurnal Kalibrasi, 22(1), 63–72. https://doi.org/10.33364/kalibrasi/v.22-1.1513
Istikomah, M., & Prasetyaningsih, E. (2021). Usulan Perbaikan Lintasan Produksi untuk Mereduksi Waste pada Departemen Kerja Produksi dengan Kombinasi Lean Manufacturing dan Theory of Constraints. Jurnal Riset Teknik Industri, 1(1), 77–87. https://doi.org/10.29313/jrti.v1i1.233
Kurniawan, R. C., Marie, I. A., & Azmi, N. (2022). Rancangan Model Konseptual denganTheory of Contraints untuk Menyeimbangkan Lini Produksi dan Meningkatkan Output pada Industri Komponen Otomotif (Design of Conceptual Model with Theory of Constraints to Line Balancing and Increase Output in the Automotive Component Industry). Operations Excellence: Journal of Applied Industrial Engineering, 14(3), 323–333. https://doi.org/10.22441/oe.2022.v14.i3.066
Lina, T. N., Rumetna, M. S., Pormes, F. S., Ferdinandus, W., & Matahelumual, F. (2022). Pelatihan Optimalisasi Sumber Daya pada Usaha Kecil dan Menengah Menggunakan Metode Simplek Serta POM-QM. ABDIKAN: Jurnal Pengabdian Masyarakat Bidang Sains Dan Teknologi, 1(4), 453–461. https://doi.org/10.55123/abdikan.v1i4.976
Nanda, A. R., Bahri, S., & Syukriah. (2022). Upaya Mengoptimalkan Kapasitas Crumb Rubber Menggunakan Metode Theory of Constraints (TOC) di PT. Bridgestone Sumatera Rubber Estate. Industrial Engineering Journal, 1(1), 1–4.
Purwadinata, S., & Batilmurik, R. W. (2020). Pengantar Ilmu Ekonomi (F. Arifin & M. A. Al Fahmy, Eds.; Vol. 1). Literasi Nusantara.
Rohman, A. S., & Muhammad, C. R. (2022). Peningkatan Throughput Garmen melalui Perbaikan Stasiun Kerja Bottleneck dengan Theory of Constraint. Jurnal Riset Teknik Industri, 2(2), 99–108. https://doi.org/10.29313/jrti.v2i2.1138
Rudiawan, H. (2021). Peranan Manajemen Produksi dalam Menyelaraskan Kinerja Perusahaan. Jurnal Manajemen FE-UB, 9(2), 66.
Santi, M. W., & Deharja, A. (2020). Analisis Kendala Penggunaan Sistem Informasi JSC with FAI di Kabupaten Jember berdasarkan Theory of Constraint (TOC). Jurnal Penelitian Kesehatan “SUARA FORIKES” (Journal of Health Research “Forikes Voice”), 11(1), 84. https://doi.org/10.33846/sf11118
Saputra, D. D. (2020). Usulan Penerapan Theory of Constraints Guna Mengoptimalkan Kapasitas Produksi Pada PT XYZ. Scientifict Journal of Industrial Engineering, 1(2), 7–11. https://doi.org/10.30998/.v1i2.1141
Situmorang, O. C., Satya, R. R. D., & Herliawan, A. (2023). Optimalisasi Perencanaan Kapasitas Produksi dengan Metode Theory of Constraints dan Rough Cut Capacity Planning. Barometer, 8(2), 19–28. https://doi.org/10.35261/barometer.v8i1.6826
Suroso, H. C., & Yulvito. (2020). Analisa Pengukuran Waktu Kerja Guna Menentukan Jumlah Karyawan Packer di PT. Sinarmas Tbk. Jurnal IPTEK Media Komunikasi Teknologi, 24(1), 67–74. https://doi.org/10.31284/j.iptek.2020.v24i1 .906
Susdarwono, E. T. (2020). Pemrograman Linier Permasalaan Ekonomi Pertahanan: Metode Grafik dan Metode Simpleks. Jurnal Teorema: Teori Dan Riset Matematika, 5(1), 89–104. https://doi.org/10.25157/teorema.v5i1.3246
Suwarso, R. H., Salmia, S. T., & Priyasmanu, T. (2021). Perencanaan Kapasitas Produksi Menggunakan Metode Rough Cut Capacity Planning (RCCP) Pada Home Industri Loca Nusa. Jurnal Mahasiswa Teknik Industri, 4(1), 21–28. https://doi.org/10.36040/valtech.v4i1.3324
Widjaja, W., Munim, A., Satugana, I. N. T. S., Aghivirwiati, G. A., Khasanah, Ekowati, D., Purbaningsih, Y., Setiadi, B., Sutangsa, & Rosalina, T. (2022). Manajemen Produksi dan Operasi (P. T. Cahyono, Ed.; Vol. 1). Yayasan Cendikia Mulia Mandiri.
Wulandari, A. C., Witonohadi, A., & Puspitasari, F. (2023). Perancangan Model Simulasi dan Perbaikan Lini Produksi Pompa Air Tipe PS-135 E Menggunakan Simulasi Diskrit dan Theory Of Constraint pada PT. Tirta Intimizu Nusantara. Jurnal Teknik Industri, 13(1), 16–33. https://doi.org/10.25105/jti.v13i1.17511
Yudistira, R., & R. Muhammad, C. (2022). Penjadwalan Produksi Menggunakan Pendekatan Theory of Constraint (TOC) untuk Mengatasi Keterlambatan pada CV. Duta Media. Bandung Conference Series: Industrial Engineering Science, 2(2), 254–261. https://doi.org/10.29313/bcsies.v2i2.3511
Copyright (c) 2025 Journal La Multiapp

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.