Line Balancing Analysis Using Ranked Positional Weight and Region Approach Methods on Broad Plate Production Line
Abstract
PT. Risa Implantama is a company engaged in the production of bone implants that focuses on the production of bone pins and screws. This company produces bone pins with various types and then markets the production results through distributors and also produces goods according to incoming orders, both from distributors and hospitals. Rapid advances in medical science and technology have significantly improved the quality and longevity of human life. The field of orthopedics in the world of medicine has also experienced technological advances in dealing with various cases in its field, one of which is bone fractures. Based on initial calculations, the line efficiency was 51.07%, then the balance delay was 48.93% and the idle time was 1.90 minutes. After processing the data using the ranked positional weight method for the line efficiency of the broad plate production process, the line efficiency results were 64.42%, then the balance delay was 35.58% and the idle time was 14.64 minutes. Furthermore, after data processing using the region approach method for the line efficiency of the broad plate production process, the line efficiency results were 54.47%, then for the balance delay of 45.53% and idle time of 14.64 minutes. Based on the calculation results, the Ranked Positional Weight (RPW) method is the optimal method in solving line balancing, because it has the highest Line Efficiency (LE) value and the lowest Balance Delay (BD).
References
Achmadi, F., Harsanto, B., & Yunani, A. (2023). Improvement of Assembly Manufacturing Process through Value Stream Mapping and Ranked Positional Weight: An Empirical Evidence from the Defense Industry. Processes, 11(5), 1334. https://doi.org/10.3390/pr11051334
Aji, R. S., & Widjajati, E. P. (2024). Line Balancing Analysis Using Ranked Positional Weight and Region Approach Method in Nail Production. Journal La Multiapp, 5(3), 232–244. https://doi.org/10.37899/journallamultiapp.v5i3.1361
Asih, P. (2021). Pengukuran efisiensi waktu proses produksi pada setiap stasiun kerja pembuatan keramik model guci ukuran tinggi 80 cm.(studi kasus pada Home Industri Jaya Ceramik Yogyakarta). Jurnal Rekayasa Industri (JRI), 3(1), 41-50. https://doi.org/10.37631/jri.v3i1.290
Bebersdorf, P., & Huchzermeier, A. (2022). Takt Time Groups in the Variable Takt. In Variable Takt Principle: Mastering Variance with Limitless Product Individualization (pp. 133-161). Cham: Springer International Publishing. http://dx.doi.org/10.1007/978-3-030-87170-3_4
Boysen, N., Fliedner, M., & Scholl, A. (2008). Assembly line balancing: Which model to use when?. International journal of production economics, 111(2), 509-528. https://doi.org/10.1016/j.ijpe.2007.02.026
Cahyana, A. S. (2015). Line Balancing Dengan Metode Ranked Position Weight (RPW). Spektrum Industri, 13(2), 157. http://dx.doi.org/10.12928/si.v13i2.2693
Chang, H. L., Silitonga, R. M., Zelita, Y., Adilah, M., & Jou, Y. T. (2022). Application of Ranked Position Weight and Region Approach Method in Overcoming Bottlenecks in Garment Industry. In RSF Conference Series: Engineering and Technology (Vol. 2, No. 1, pp. 23-36). https://doi.org/10.31098/cset.v2i1.507
Eyers, D. R., & Potter, A. T. (2017). Industrial Additive Manufacturing: A manufacturing systems perspective. Computers in industry, 92, 208-218. https://doi.org/10.1016/j.compind.2017.08.002
Gaspersz, V. (2004). Production planning and inventory control. PT Gramedia Pustaka Umum, Jakarta.
Hammer, L. B., Brady, J. M., Brossoit, R. M., Mohr, C. D., Bodner, T. E., Crain, T. L., & Brockwood, K. J. (2021). Effects of a Total Worker Health® leadership intervention on employee well-being and functional impairment. Journal of Occupational Health Psychology, 26(6), 582. https://psycnet.apa.org/doi/10.1037/ocp0000312
Hidayat, J. M. A. P. M. (2019). Analisis implementasi quality control pada produksi gula pt. Perkebunan nusantara xiv (persero) pabrik gula takalar kabupate takalar. Jurnal Profitability Fakultas Ekonomi Dan Bisnis, 3(1). http://dx.doi.org/10.17605/OSF.IO/XW6EF
Hitomi, K. (2017). Manufacturing systems engineering: a unified approach to manufacturing technology, production management and industrial economics. Routledge.
Kusuma, T. Y. T., & Firdaus, M. F. S. (2019). Penentuan jumlah tenaga kerja optimal untuk peningkatan produktifitas kerja (studi kasus: UD. Rekayasa Wangdi W). Integrated Lab Journal, 7(2), 26-36.
Luciano, É. L., Okano, M. T., Ribeiro, R. B., Rocha, T. C. F., & Chaves, W. A. D. (2021). Implementation of Takt Time in the Development of a New Value Stream Mapping in the Production of Coffee Powder. In Industrial Engineering and Operations Management: XXVI IJCIEOM (2nd Edition), Rio de Janeiro, Brazil, February 22–24, 2021 26 (pp. 523-534). Springer International Publishing. http://dx.doi.org/10.1007/978-3-030-78570-3_40
Nindie, A. (2022). Leadership Management Of School Principles: A Case Study of Public Elementary Schools in Bogor Regency. AKADEMIK: Jurnal Mahasiswa Humanis, 2(1), 19-28. https://doi.org/10.37481/jmh.v2i1.465
Pianda, D. (2018). Optimasi perencanaan produksi pada kombinasi produk dengan metode linear programming. CV Jejak (Jejak Publisher).
Prabowo, R. (2016). Penerapan Konsep Line Balancing Untuk Mencapai Efisiensi Kerja Yang Optimal Pada Setiap Stasiun Kerja Pada PT. HM. Sampoerna Tbk. Jurnal Iptek, 20(2), 9-20. https://doi.org/10.31284/j.iptek.2016.v20i2.25
Putra, B. I., & Jakaria, R. B. (2020). Buku Ajar Analisa dan Perancangan Sistem Kerja. Umsida Press, 1-207. https://doi.org/10.21070/2020/978-623-6081- 01-3
Rachman, T., Utara, J. A., Tomang-Kebon, T., & Jakarta, J. (2013). Penggunaan metode work sampling untuk menghitung waktu baku dan kapasitas produksi karungan soap chip di PT. SA. Jurnal Inovisi, 9(1), 48-60.
Saputra, J., Hafrida, E., & Musri, M. (2021). Pengukuran Waktu Kerja Berbasis Stopwatch Time Study dan Analisis Keselamatan Kesehatan Kerja Pada Pabrik Tahu Sukri Bukit Batrem Dumai. Jurnal ARTI (Aplikasi Rancangan Teknik Industri), 16(1), 86-93.
Sari, E. M., & Darmawan, M. M. (2020). Pengukuran waktu baku dan analisis beban kerja pada proses filling dan packing produk lulur mandi di PT. Gloria Origita Cosmetics. Jurnal ASIIMETRIK: Jurnal Ilmiah Rekayasa & Inovasi, 51-61. https://doi.org/10.35814/asiimetrik.v2i1.1253
Sinulingga, S. (2009). Perencanaan dan pengendalian produksi. Yogyakarta: Graha Ilmu.
Soliman, M. H. A. (2023). Toyota Production System Concepts: Takt Time-Understanding the Core Principle of Lean Manufacturing. Mohammed Hamed Ahmed Soliman.
Supriyanto, E. (2020). Manufaktur dalam dunia teknik industri. Jurnal Industri Elektro dan Penerbangan, 3(3), 1-4.
Tarigan, U., & Ambarita, M. B. (2018, February). Production layout improvement by using line balancing and Systematic Layout Planning (SLP) at PT. XYZ. In IOP Conference Series: Materials Science and Engineering (Vol. 309, No. 1, p. 012116). IOP Publishing. http://dx.doi.org/10.1088/1757-899X/309/1/012116
Widyasari, J. (2023). Analisis Konsep Line Balancing Untuk Mencapai Efesiensi Kerja Batako Dengan Pendekatan Heuristic (Studi Kasus: Cv. Doja Beton Pracetak) (Doctoral dissertation, Universitas Hasanuddin).
Wignjosoebroto, S. (2006). Ergonomi Studi Gerak dan Waktu edisi keempat. Guna Widya, Surabaya.
Copyright (c) 2025 Journal La Multiapp

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.