Huliyah, N., and B. E. Yuwono. “The Impact of Overlapping Phases in EPCC Projects on the Accuracy of 4D BIM (Time) and 5D BIM (Cost): A Literature Review”. Journal La Multiapp, Vol. 7, no. 4, Oct. 2026, pp. 1017-30, doi:10.37899/journallamultiapp.v7i4.5101.