[1]
F. D. Trisamiyanto and B. Susetyo, “Cost Optimization Through Value Engineering and Risk Analysis in Industrial Building Retrofitting Projects”, JLMA, vol. 6, no. 6, pp. 1449-1471, Nov. 2025.