[1]
V. F. Bahari and M. A. Rizki, “Cost and Time Performance Analysis Using the Earned Value Concept in the Construction of the Integrated Lecture Building at the State Polytechnic of Shipbuilding Surabaya ”, JLMA, vol. 6, no. 3, pp. 701-713, Jul. 2025.