Iqbal, M. B. and Silvianita, S. (2025) “Acceleration of Modular Oil and Gas Project Duration Using the Time-Cost Trade-Off Method”, Journal La Multiapp, 6(5), pp. 1213-1231. Available at: https://newinera.com/index.php/JournalLaMultiapp/article/view/5846 (Accessed: 15October2026).