Huliyah, N. and Yuwono, B. E. (2026) “The Impact of Overlapping Phases in EPCC Projects on the Accuracy of 4D BIM (Time) and 5D BIM (Cost): A Literature Review”, Journal La Multiapp, 7(4), pp. 1017-1030. doi: 10.37899/journallamultiapp.v7i4.5101.