Iqbal, M. B. and Silvianita, S. (2025) “Acceleration of Modular Oil and Gas Project Duration Using the Time-Cost Trade-Off Method”, Journal La Multiapp, 6(5), pp. 1213-1231. doi: 10.37899/journallamultiapp.v6i5.2307.