Huliyah, Nadiatul, and Bambang Endro Yuwono. 2026. “The Impact of Overlapping Phases in EPCC Projects on the Accuracy of 4D BIM (Time) and 5D BIM (Cost): A Literature Review”. Journal La Multiapp 7 (4), 1017-30. https://doi.org/10.37899/journallamultiapp.v7i4.5101.