Afriza, Ajeng, and Rr. Rochmoeljati. 2025. “Woven Bag Production Scheduling With Heuristic Pour Algorithm and Earliest Due Date”. Journal La Multiapp 6 (3), 548-59. https://doi.org/10.37899/journallamultiapp.v6i3.1971.