Huliyah, N., & Yuwono, B. E. (2026). The Impact of Overlapping Phases in EPCC Projects on the Accuracy of 4D BIM (Time) and 5D BIM (Cost): A Literature Review. Journal La Multiapp, 7(4), 1017-1030. https://doi.org/10.37899/journallamultiapp.v7i4.5101