Iqbal, M. B., & Silvianita, S. (2025). Acceleration of Modular Oil and Gas Project Duration Using the Time-Cost Trade-Off Method. Journal La Multiapp, 6(5), 1213-1231. https://doi.org/10.37899/journallamultiapp.v6i5.2307