(1)
Huliyah, N.; Yuwono, B. E. The Impact of Overlapping Phases in EPCC Projects on the Accuracy of 4D BIM (Time) and 5D BIM (Cost): A Literature Review. JLMA 2026, 7, 1017-1030.