(1)
Bahari, V. F.; Rizki, M. A. Cost and Time Performance Analysis Using the Earned Value Concept in the Construction of the Integrated Lecture Building at the State Polytechnic of Shipbuilding Surabaya . JLMA 2025, 6, 701-713.