[1]
Huliyah, N. and Yuwono, B.E. 2026. The Impact of Overlapping Phases in EPCC Projects on the Accuracy of 4D BIM (Time) and 5D BIM (Cost): A Literature Review. Journal La Multiapp. 7, 4 (Oct. 2026), 1017-1030. DOI:https://doi.org/10.37899/journallamultiapp.v7i4.5101.