[1]
Iqbal, M.B. and Silvianita, S. 2025. Acceleration of Modular Oil and Gas Project Duration Using the Time-Cost Trade-Off Method. Journal La Multiapp. 6, 5 (Sep. 2025), 1213-1231. DOI:https://doi.org/10.37899/journallamultiapp.v6i5.2307.