[1]
Bahari, V.F. and Rizki, M.A. 2025. Cost and Time Performance Analysis Using the Earned Value Concept in the Construction of the Integrated Lecture Building at the State Polytechnic of Shipbuilding Surabaya . Journal La Multiapp. 6, 3 (Jul. 2025), 701-713. DOI:https://doi.org/10.37899/journallamultiapp.v6i3.2154.