[1]
Afriza, A. and Rochmoeljati, R. 2025. Woven Bag Production Scheduling With Heuristic Pour Algorithm and Earliest Due Date. Journal La Multiapp. 6, 3 (Jun. 2025), 548-559. DOI:https://doi.org/10.37899/journallamultiapp.v6i3.1971.